In June 2012 PCS Business Systems carried out extensive works for West Midlands based Carwood Motors, whom are remanufacturers of vehicle (diesel fuel injection), electrical and ancillary systems.
Troax and Lee Manufacturing were tasked with supplying their Titan duel line system, as well as non-fire rated double skin Elan system.
Lee Manufacturings double skin steel partitioning systems were installed at the Smethwick site, with the Titan system being used to create their main testing, development and processing areas, specifically because a clean environment was vital due to the nature of the component parts and exacting specifications for the final developed systems.
Lee Manufacturings Elan range of partitioning was used to form a number of new product assembly areas. The success of this install has resulted in a number of further installations of the same Elan and Titan double skin steel partitioning systems.