> > Cherry Lane Children's Centre, West Drayton
Structural Insulated Panels
prev 1 / 3 next

Related Case Study

Cherry Lane Children's Centre, West Drayton

31 Aug 2011

Client: Hillingdon Borough Council
Main Contractor: Mark Dudek Associates
Type of works: Build It Green Structural Insulated Panels forming the roof and walls

A modern oval shaped design utilising steel and glulam timber portal framing with Build It Green Structural Insulated Panels forming the roof and walls.
The open plan rooms and exposed feature glulam were partitioned off using factory made timber frame walls.

An adjoining consulting room was added post construction to the Children's Centre, showcasing the versatility of SIP construction.

The natural cedar board used to clad the exterior of the building was complimented by the installation of aluminium finished windows and doors.

EMAIL A FRIEND

 
Eco Aspects

T (0845) 900 0326

F (0845) 900 0329

E info@ecoaspects.co.uk

Visit website

Unit 4, Longham Business Centre, 168 Ringwood Road, Ferndown, Dorset, BH22 9BU

Close
COMPANY CONTACT FORM
* Oops!
* Oops!
* Oops!
* Oops!
* Oops!
  Tick here to start receiving free Barbour Product Search email newsletters. * Oops!
* sorry this is a required field
MESSAGE SENT!

Thanks for using Barbour Product Search,

Your enquiry has been sent to the selected manufacturers, they will be in contact shortly.