Elite Systems GB provided modular building for the Harris Academy School, Croydon.
The school required a 6 classroom, double storey complex installing in a lower level
courtyard, which had to be in-keeping with other timber clad buildings
Elite Systems were able to provide a full turnkey package for the client including
Groundworks and landscaping as well as the modular building.
As there was no access, all materials & plant had to be craned in to the court
yard all waste from groundworks process, craned out.
Once installed, the building was clad with Siberian Larch tongue & groove timber.