Marks & Spencer Distribution Centre, Bradford

Marks & Spencer Distribution Centre, Bradford

Contractor: Winvic Construction
Type of works: design, manufacture and installation of an entrance canopy.

After numerous discussions and an in-depth site survey with Winvic, the canopy was designed, manufactured and installed by External Solutions, in a very short time frame due to site constraints.

All CAD and structural calculations were given quickly to allow the contractor the time to install correct footings for erection of the canopy. Unfortunately due to technical issues on site, the initial installation date had to be cancelled by Winvic. External Solutions worked alongside the contractor to resolve these issues and allocated a new installation date within the very tight time frame before handover.

Installation took place within the building site (as per images attached) with all safety measures and site rules adhered to at all times, handing over the canopy to the contractor before the time frame allocated.

Add to Project Board

Create a new project board:


Categories

Canopies