Nexus® soffit units for Olympic Park redevelopment

Nexus® soffit units for Olympic Park redevelopment

Nexus® brick faced soffit units and lintels were chosen for a mixed use development on the southern fringes of the Olympic Park comprising 219 homes, 10,000 square feet of commercial space and new public walkways.

To maximise the desired clean, uncluttered lines, the architects needed a quick and simple method of achieving flawless brick-faced soffits to the hundreds of door and window heads.

The solution was the Nexus® system, a ground-breaking range of lightweight brick faced soffit systems and lintels developed by two of the leading names in the industry, brick support specialist Ancon and brickwork component manufacturer, Ibstock Kevington.

Nexus brick faced soffits are two-part systems that combine a high integrity stainless steel brickwork support system with custom-designed prefabricated brick faced soffit units. Similarly, Nexus brick-faced lintels are high strength stainless steel lintels with a permanently bonded brick slip facing available in any bond pattern to suit the application. Being 70% lighter than traditional cast concrete solutions, the Nexus soffit system can be simply lifted and bolted into position by hand and, as the brick slip facing is manufactured from the same batch as the main brickwork, they present a perfect colour and texture match for flawless transitions.

The flexibility of the Nexus system meant that a complete soffit and lintel solution was developed for the project. Deep soffits above doorways to the ground and first floor were achieved easily with 215mm deep units featuring header bond facing, bolted directly to Ancon MDC brick support angles, while stretcher bond lintels, manufactured 150mm longer to accommodate site variations and ensure perfect alignment with the main facing brickwork, were used at each window head.

To create deep ‘flying beams’ above upper storey stairwells, a number of ‘special’ soffit units, featuring facing brickwork to all four sides, were designed and bolted directly to Ancon MDC brick support systems, which were pre-fixed to the structural steel frame.

As mechanical lifting equipment was not required, contractor, Flahive Brickwork, was able to install the Nexus units in around one tenth of the time of traditional heavyweight precast concrete alternatives. With a delivery schedule of 25 Nexus units, equivalent to 75 metres of soffit run, per day the Ancon-Ibstock Kevington partnership was able to meet the tight project programme set by clients, Southern Spaces and Southern Housing Group.