> > Performing Arts Studio, Edgbaston High School for Girls, Birmingham

Related Case Study

Related News Feature

Performing Arts Studio, Edgbaston High School for Girls, Birmingham

22 Oct 2008

Client: Edgbaston High School for Girls
Architect: Malcolm Payne Group
Type of works: supply of Faber 2000 electrically-operated blackout roller blinds.

The building is a recently completed multi-purpose performing arts studio built for this large independent girls school catering for over 900 pupils in an age range from 2˝ to 18 years. The building is octagonal in shape with a pitched roof rising to a ceiling height of 14m, incorporating the latest technology for acoustics and lighting. The blinds were installed to replace the blackout curtains originally installed, in order to achieve complete light exclusion.

The blinds are operated remotely by radio control from a central lectern in the room, and coupled so a single motor operates two blinds. Pile weatherstrips are included in the side channels and a flexible light exclusion strip fitted to the bottom bar for maximum light exclusion.

EMAIL A FRIEND

 
Faber Blinds

T (01604) 658282

F (01604) 708559

E sib@faber.dk

Visit website

Kilvey Rd, Brackmills, Northampton, NN4 7BQ

Related product categories
Blackout blinds


Close
COMPANY CONTACT FORM
* Oops!
* Oops!
* Oops!
* Oops!
* Oops!
  Tick here to start receiving free Barbour Product Search email newsletters. * Oops!
* sorry this is a required field
MESSAGE SENT!

Thanks for using Barbour Product Search,

Your enquiry has been sent to the selected manufacturers, they will be in contact shortly.