> > Roadchef Motorway Services, Winchester. Installation of Royal tempered glass sliding/folding closures.
Shutters and grilles, rolling
prev 1 / 3 next

Related Case Study

Related News Feature

Roadchef Motorway Services, Winchester. Installation of Royal tempered glass sliding/folding closures.

20 Jun 2004

Roadchef Motorway Services, Winchester

Client: Roadchef Motorway Services
Architect: Turnkey Design Partnership
Contractor: P J Carey (Contractors) Ltd
Type of works: installation of Royal tempered glass sliding/folding closures

This was a fast-track project by P J Carey (Contractors) Limited for the complete construction of the new motorway service areas on the north and south sides of the M3 between Junctions 8 and 9 near Winchester.

Through close co-ordination with P J Carey's site team, installation was completed within the tight programme set by the client.

Turnkey Design Partnership captured the brief, principally designing the 12 retail units to follow along flowing curves. Through a longstanding association Turnkey Design again opted for SimFlex Royal tempered glass sliding/folding closures for their simplicity and capacity to follow virtually any layout. The stacked closures discreetly park at 90° to the unit fronts within a simple stacking pocket, thus creating more entrance space during opening hours.

EMAIL A FRIEND

 
SimFlex Grilles & Closures

T (01525) 841100

F (01525) 405561

E sales@simflex.co.uk

Visit website

9 Woburn St, Ampthill, Beds, MK45 2HP

Related product categories
Shutters


Close
COMPANY CONTACT FORM
* Oops!
* Oops!
* Oops!
* Oops!
* Oops!
  Tick here to start receiving free Barbour Product Search email newsletters. * Oops!
* sorry this is a required field
MESSAGE SENT!

Thanks for using Barbour Product Search,

Your enquiry has been sent to the selected manufacturers, they will be in contact shortly.