> > Sellafield B41 Waste Retrieval Plant

Related Case Study

Related News Feature

Sellafield B41 Waste Retrieval Plant

1 Jan 2010

Type of works: design, manufacture and installation of a gastight hinged double-leaf door.

Booth was awarded the design, manufacture and installation of a gastight hinged double leaf door to prevent airborne contamination within a nuclear site.

Challenged by crane rails the doorset was to provide maximum airtight performance and used a series of removable and fixed sealing plates.

Multiple sealing clamps provided seal compression, and hinged panels allow the door leaves to swing open.

Key operated access interlocks ensure operation at permitted sequence only with a double-pivot hinge system allowing the double-leaf doors to hinge clear of the area traversed by the crane.

EMAIL A FRIEND

 
Booth Industries

T (01204) 366333

F (01204) 380888

E marketing@booth-industries.co.uk

Visit website

PO Box 50, Nelson St, Bolton, BL3 2AP

Close
COMPANY CONTACT FORM
* Oops!
* Oops!
* Oops!
* Oops!
* Oops!
  Tick here to start receiving free Barbour Product Search email newsletters. * Oops!
* sorry this is a required field
MESSAGE SENT!

Thanks for using Barbour Product Search,

Your enquiry has been sent to the selected manufacturers, they will be in contact shortly.