Serge Ferrari in pole position for last 14 years!

Serge Ferrari in pole position for last 14 years!

Architect: Hermann Tilke
Client: Malaysia Airport Authority
Consulting engineer: Buro Happold
Fabrication/Installation: Alom Building System.Bhd.
Products: Serge Ferrari flexible composite materials
• Précontraint 1002 T
• Précontraint 702 T

Each year, the Sepang International Circuit hosts the Malaysian Grand Prix. The circuit structures are extraordinary with expansive technical and press complexes which encompass 70,000 square meters of protected spectator stands. This structure has stood wrinkle-free and without folds since its debut in 1998 thanks to its Serge Ferrari composite material.

The aesthetic durability of Serge Ferrari composite membranes is due to high performance polymer formulations enhanced with fluorinated treatments. The Precontraint Serge Ferrari manufacturing technology process assures excellent dimensional stability and structural sustainability of the project.

Grand Stand, offering a 53,000 spectator capacity, and of the giant parasols have therefore maintained their remarkable dimensional stability, bright aspect and original colour, despite the extreme climatic conditions and agressive atmosphere (pollution, tropical humidity, UV, etc.).

Add to Project Board

Create a new project board:

View Canopies and Awnings: Précontraint® Product Entry
Serge Ferrari

Serge Ferrari

The Ferrari group is a global player in the manufacturing of composite textile membranes based on Precontraint technology. Serge Ferrari's experience, plus its high-performance products, has enabled the Group to develop specific textile membrane...
View company profile
T(01432) 890711
WVisit Serge Ferrari's website
 Little Tustan, Ledbury, HR8 2RS



Make an enquiry to Serge Ferrari

You may also be interested in this related Case Study: Broxap canopy for Bushbury Hill Read Now