Stair balustrade for Pentland Homes apartment development

Stair balustrade for Pentland Homes apartment development

Key features of the FUSION® Commercial Indoor System
• Pre-finished round oak rails and newels
• Pre-cut metal balusters and connectors in a modern Brushed Nickel finish
• Suitable for stair pitches of 33˚- 42˚
• Suitable for handrail heights of 900mm for staircases and 1100mm for landings
• Suitable for use on timber, concrete or metal staircases
• Compliant with UK Building Regulations
• Tested for public stairs requiring loadings of 0.74kN/m
• Easy to install, delivering labour, time and cost savings
• Available ex-stock

Introduction:
Pentland Homes is an award-winning housebuilder and one of Kent’s leading regional property developers. In 2007, the company completed a contemporary development of 8 apartments located in the scenic port town of Hythe.

The customer:
Established in 1998, Pentland Homes specialises in building homes to high specifications, using traditional construction methods. The developer achieved Gold Status in the Best House category and Silver in the Best Small House Builder category at the 2006 What House Awards.

The project:
Set in half an acre of landscaped communal gardens, Howey Apartments is a three-storey development comprising eight generously proportioned two-bedroom apartments.

Overlooking the Royal Military Canal, the apartments have an exceptionally light and airy feel, thanks to double height glazing, porthole-style windows and roof skylights. The first and second floor apartments have recessed balconies offering sea views and each apartment has been finished to a high standard with elegant, contemporary interiors.

The balustrade:
FUSION® Commercial stair balustrade was installed from the ground to the second floor in the modern, shared entrance stairwell.The staircase was a closed string with a straight step. The first flight of stairs from the ground to the first floor incorporated 15 steps, leading to a top landing with a 180º twin return. The balustrade was then fitted along the landingto meet the bottom of the second flight. This flight incorporated a further 15 steps from the first to second floor, leading to a final top landing with a 270º return.

Add to Project Board

Create a new project board:


Richard Burbidge

View company profile
T(01691) 678300
F(01691) 657694
Einfo@richardburbidge.co.uk
WVisit Richard Burbidge's website
 Whittington Rd, Oswestry, Shropshire, SY11 1HZ

Make an enquiry to Richard Burbidge

You may also be interested in this related Case Study: Woodberry Down Phase 2 Block B Read Now