Barbour Product Search

Manufacturer

Spotlight

27 Jul 2026


Manufacturer Spotlight: Why AliDeck’s Drainage Specification Report Can Benefit You!

Vandersanden

Vandersanden Logo

Why AliDeck’s Drainage Specification Report Can Benefit You!


Since NHBC Standards in 2021, a piped or controlled drainage system is mandatory on all balcony and terrace areas. Free-draining balconies, where rainwater is allowed to drip directly onto the level below, are no longer acceptable for new-build developments seeking an NHBC warranty. So, this is where AliDeck can step in and help:

We produce a free, project-specific Drainage Specification Report with every specified AliDrain system, containing everything your inspector needs to grant sign-off. Over 80 completed so far, 100% approval rate.

Learn more


How your Drainage Specification Report works?

Step 1: Project Review

Contact us, for a Teams or phone call to review your project and discuss the drainage requirements for your balconies and terraces. Make sure you tell us:

- Number & Types of Balconies
- Preferred Drainage Strategy
- Downpipe & Overflow Locations
- Project Programme & Timeline

Step 2: Send Drawings

To produce your report, we will need the following information:

- Floor Plans, Elevations & Sections
- Project Location
- Balcony Types, Quantities & Dimensions
- Drainage Strategy Preference
- Downpipe & Overflow Positions

Step 3: We Create the Report

Our Technical Team produces a comprehensive, project specific Drainage Specification Report. This includes:

- Hydraulic Calculations
- Product Specifications
- Installation Methodology
- Discharge Strategy
- Compliance References

Step 4: Report Delivered

We send the completed report directly to you. You pass it on to your NHBC inspector as part of your warranty submission.

- Job Done✅

What will a Drainage Specification Report look like?


Each report is produced specifically for your project, not a generic template. It is professional, structured document that provided the NHBC with all the technical evidence required to approve your balcony drainage strategy.

The example shown here is a representation of the reports we product. All client data is redacted to protect confidentiality, but the format and content are consistent across all projects.

- Project-specific hydraulic drainage calculations
- Balcony type schedules with dimensions and quantities
- Drainage strategy drawings (plan and section)
- Product specifications and material standards
- Installation methodology and fall requirements
- Downpipe and overflow sizing and locations
- References to NHBC Standards 2024 and BS 8579:2020
- Discharge strategy and connection details



Find out more

RIBA CPD

Why should you choose AliDeck for your report?

De-Risks Your Project

By following our process, it eliminates the risk of non-compliant specifications reaching site, as your design team can follow our guidance from the outset, preventing costly redesigns, procurement delays, and NHBC rejection.

Accelerates NHBC Sign-Off

The report is a ready-made submission document that addresses all of NHBC’s drainage requirements in one place, reducing back and forth with inspectors and keeping your programme on track.

Cost Certainty & Right Spec

AliDeck’s “Right Spec Guarantee” ensures the report proposes the most cost-effective complaint solutions, preventing over-engineering, unnecessary expenditure, and wasted materials.

Prevents Long-Term Deflects

A system sized to the 1:50 and 1:100 year storm criteria for your project’s location prevents water ingress, staining, and structural damage, protecting your reputation and reducing warranty claims.

Simplifies the Fabricator’s Scope

Clear, project-specific technical drawings covering downpipe location, overflow positions, gutter sizing, and fall requirements remove ambiguity from fabrication and reduce the risk of site clashes.

Inspiration Guide

What Drainage options can we offer for your project?

Deck-Level Piped Drainage:

Water is collected at deck level via integrated gutters within the AliDrain system and directed to a downpipe. No fall required on 20mm boards up to 4.25m, or 30mm boards up to 6m.

Soffit Piped Drainage:

Drainage infrastructure is concealed within the soffit, providing a clean, unobtrusive appearance without compromising performance.

Edge Drainage:

Water is directed via a formed soffit drainage tray to a continuous perimeter edge, suitable for balconies projecting up to 2.5m from the building face.

Texture Generator

Contact and support

To access more information or speak to a member of the AliDeck team, please use the contact details below:

T: 01622 534050
E: info@alideck.co.uk
W: www.alideck.co.uk

 

AliDeck

Europa & Jenner House, Victory Park, 1-2 Trident Close, Medway City Estate, Rochester, ME2 4ER

T 01622 534267

Einfo@alideck.co.uk

WVisit the AliDeck website

View the AliDeck company profile

 

www.barbourproductsearch.info

Facebook Twitter LinkedIn Pinterest Youtube

Barbour ABI Limited. Company number: 13427982. Registered office: 5th Floor, 133 Houndsditch, London, EC3A 7BX
T: 0151 353 3500   F: 0151 353 3637   E: editor@barbourproductsearch.info

Place of registration: England and Wales Company Number 370721.
Registered office: 5 Howick Place, London, SW1P 1WG

   

View online  Ι   Unsubscribe