Barbour Product Search is part of the Informa Intelligence Division of Informa PLC

This site is operated by a business or businesses owned by Informa PLC and all copyright resides with them. Informa PLC's registered office is 5 Howick Place, London SW1P 1WG. Registered in England and Wales. Number 8860726.

Offsite work from Hadley the key to an efficient build for The Depot

Offsite work from Hadley the key to an efficient build for The Depot

Hadley Steel Framing’s light gauge steel profiles have been installed in a nine-storey student accommodation in Exeter, called The Depot. The £40m development will provide accommodation for circa 600 students.

The space comes complete with a number of restaurants and bars, as well as a retail and shopping area.

Hadley Steel Framing provided a complete system from conceptual design through to installation using its pre-panelised, off-site bolted frame in conjunction with its composite concrete decking floor system.

The build at The Depot broke ground in July 2017 with the installation of the Hadley Steel Framing system starting on site in April 2018. Work was completed on the site in February 2019, with students scheduled to move into the accommodation from September 2019.

As the internal and external finishes still needed to be fitted out as part of the building program after Hadley’s work was completed, the specification team looked for products that could be delivered and installed on site as efficiently as possible. Hadley Steel Framing’s light gauge steel systems were considered ideal. The flexible systems could be delivered and installed easily on site and were used for some of the accommodation’s most critical components.

This was particularly useful for the installation of the bathroom pods, which could be transferred by crane into position. The bathroom pods were installed across each of the 601 bedrooms, saving a considerable amount of time for the contractor.

Installing these modular units was an easier process than the more traditional method of building the bathrooms in situ. As a result, the contractor could complete the task independently and didn’t need to spend additional money employing specialist trades.

Hadley Steel Framing also supplied pre-assembled panels for the development, which could be simply erected on-site via the tower cranes. The products arrived on site with all openings formed and steel brickwork support plates already in place. This allowed the façade installers to begin their work immediately.

Hadley Steel Framing supplied the main structural components of the external and internal wall panels, composite floor slabs, steel brickwork support plates, metal stairs and pre-panelised roof structure.

Speaking about the project, Henry Yolland, Package Engineer for the main project contractor, Sir Robert McAlpine, commented: “Hadley Steel Framing systems were used extensively throughout the project and made work much easier to progress. The company’s systems were particularly useful with regard to installing the bathroom pods, which we were able to simply crane into position and fit into place. The pre-assembled panels were very similar and once again, we could simply erect them via the tower cranes.”

As well as all the other steel systems, the project also utilised a scaffold-less edge protection system, as well as pre-fabricated steel frame stair units all designed and detailed in house by the Hadley Steel Framing technical team.

Add to Project Board

Create a new project board:


The Hadley Group

The Hadley Group

Hadley Group is a world leader in advanced cold rolled steel technology, with manufacturing facilities in Europe, the Middle East and Southeast Asia.

The company delivers innovative solutions with applications across sectors as diverse as...
View company profile
T(0121) 555 1300
F(0121) 555 1301
E[email protected]
WVisit The Hadley Group's website
 Downing St, Smethwick, West Midlands, B66 2PA

Products by this Company

Make an enquiry to The Hadley Group

You may also be interested in this related Case Study: Hadley's methods at Littlethorpe could be answer to housing shortage Read Now