State-of-the-art leisure centre chooses Polyroof’s Protec system

State-of-the-art leisure centre chooses Polyroof’s Protec system

Since the newly constructed Fleming Park Leisure Centre is nearing completion, Polyroof explore the challenges and solutions of this vast project that involved insulating and waterproofing over 8,500m2 of flat roof areas.

The new building incorporates a high quality design in keeping with the parkland environment and has high environmental standards.

The new leisure centre will boast many facilities that are larger than at present, including an eight-lane, 25-metre swimming pool, a larger, versatile learner pool, 15 badminton court sports hall, a versatile, multi-station gym and a group spinning studio.

Following decades of experience using Polyroof’s liquid systems to protect buildings throughout the district, including waterproofing the original Fleming Park Leisure Centre back in the early 1990’s, Eastleigh Council specified the Protec system for the project.

Some of the key reasons why Eastleigh chose Polyroof’s Protec system include:

A warm roof build-up that can be made waterproof at multiple stages: For larger projects where the roof is installed in a phased approach, the Protec Warm Roof system can be made temporarily waterproof at two stages prior to the application of the full waterproofing system. The first stage is upon installation of the sealed, aluminium-faced vapour barrier. The second phase is following the reinforcing of the foil-faced insulation board joints with Protec resin and taping mat. This enables a much more measured, controlled approach to the installation with a greatly reduced chance of rain causing disruption and damage during the works.

Tough and impact-resistant waterproofing: Because the risk of damage to the membrane by other trades during construction is minimised, the roof can be made waterproof at the earliest possible stage. With a project such as this, with an 85 week construction timeframe, having the peace of mind that the roof is waterproof and will remain so during other works is of great value.

Highly flexible membrane: Regardless of the size of the roof, Protec forms a homegenous membrane, without a single joint or seam and without the need for any expansion joints.

RapidCure technology for quick installation: From its application as a liquid, through the curing process to form a sold, tough membrane that can be walked over takes only 30-60 minutes. This enables large sections of the roof to be fully completed in a short space of time.

Following stringent tendering processes, Eastleigh Borough Council appointed AHR as architects and Interserve as the main contractor for the new Fleming Park Leisure Centre project. The Roofline Group, one of the UK’s premier roofing and waterproofing specialist and a Polyroof approved installer, were appointed as the roofing contractor for the works.

Polyroof's Technical Services worked closely with all parties from an early stage of the design process to ensure that the installation runs smoothly, with any potential issues being resolved before the works begin.

Polyroof's technical services during the design stage included:

• Assisting with CAD production for a range of bespoke details.
• Thermal calculations to determine the amount of insulation required to achieve target U-Value of 0.14 W/m2K.
• Wind uplift calculations to demonstrate suitable resistance of the adhesively-bonded warm roof system to wind uplift.
• Full bespoke specification covering their full set of recommendations that was regularly updated as the design stage progressed.

The Protec system provided waterproofing to all flat roof areas as well as the extensive parapet wall sections. The roof areas were made up of two designs: the Protec Warm Roof System to (approx 7,500m2) and Protec applied to concrete as part of an inverted roof design (approx 1,000m2).

The roof installation was carried out within a planned, phased approach that was synchronised to the wider construction schedule. For the warm roof areas, the first stage was to fill the troughs of the structural metal roof deck with acoustic insulation infills that will dampen external noise within the leisure centre. Next, the crowns of the deck were primed ready to receive the self-adhesive vapour barrier.

The use of a high-performance aluminium vapour barrier not only eliminates the risk condensation within the roof but also provides temporary waterproofing protection, which is extremely useful on larger works such as this.

The Polyroof RES Insulation boards, which comprised of a two layer system totalling 170mm to achieve a U-Value of 0.14 W/m2K, were bonded using high-performance PU adhesive to the vapour barrier. Following the wind uplift calculations it was determined that mechanical fixings were not required for this application - making for an extremely rapid installation.

A key advantage of using a tongue and groove insulation system is that the finished surface of the roof is smooth and level without any unsightly board steps that can also lead to standing water issues. The insulation board joints were sealed using Protec resin with Polymat Taping Mat 450 which, in addition to providing additional strength to the joints, also creates a temporarily waterproof layer.

The final stage of the warm roof installation is to apply the Protec system directly to the insulation boards - without the need for costly carrier layers.

For the inverted roof sections, Protec was applied directly to the primed concrete/screed surface. The membrane was inspected by Polyroof Technical Services, signed off and then covered with inverted roof components. When using Protec in inverted roof situations, its incredible durability performance - as tested by the BBA, "can provide an effective barrier to the transmission of liquid water and water vapour for the design life of the roof in which it is incorporated."

Throughout the duration of the contract, Polyroof Technical Services carried out regular site visits that were reported back to Interserve as part of Polyroof's free-of-charge contract monitoring service. This enabled the client to keep up-to-date with the progress of the roof installation in detail and also provided peace of mind that the original specification was being closely followed and implemented.

From beginning to end, Polyroof worked closely with the Roofline Group during the installation, enabling the challenges were identified and solved in an efficient and coordinated manner - saving the client time and money.

As the completion date for this vast leisure centre - the third largest in the UK - draws closer, the project continues to run on schedule. With the roof areas now firmly watertight, work on the interior continues without disruption from the elements.

Add to Project Board

Create a new project board:


View Protec Liquid Roofing System Product Entry
Polyroof Products

Polyroof Products

Polyroof has been at the forefront of cold liquid-applied roofing technology for over 30 years and use this expertise to deliver the very best products and services available on the market. No matter what challenges your project may present, Polyroof...
View company profile
T(01352) 735135
 0800 801 809 Tech Dept.
F(01352) 735182
E[email protected]
WVisit Polyroof Products's website
 Furness House, Castle Park Ind Est, Flint, Flintshire, CH6 5XA

Make an enquiry to Polyroof Products

You may also be interested in this related Case Study: Roof refurbishment for the Teesside University Greig Building Read Now