The Faraday House development was part of the first phase of the Battersea Power Station redevelopment in London. It is a building with identity and imagination and a golden glittering billboard for the project that provides homes of exceptional quality on a difficult, linear site.
EJOT’s growing range of innovative solutions for the installation of ETICS (External Thermal Insulation Composite Systems) – also known as EWI (External Wall Insulation) systems – is playing an increasingly important role in enabling quality and performance to be optimised in external envelope refurbishment and new build projects.
Ascent Logistics Park in Leighton Buzzard is a forward-thinking, sustainable construction project situated in one of the UK’s newly recognised industry hotspots. When work started on Phases 2 and 3, Gatic CastSlot and Gatic Kerbdrain from Alumasc Water Management Solutions (AWMS), were specified due to their unrivalled track record for performance and longevity.
Eurosafe Solutions opted for the Ascent™ Aluminium Roof Walkway and step system for installation at the Futamura manufacturing facility in Cumbria. Ensuring a safe maintenance access strategy, the Ascent™ Aluminium Roof Walkway provides a level, free-draining, anti-slip surface for maintenance personnel.
The installation of a resin floor screed is not rocket science but rather the application of aggregates, resin or other materials mixed to a perfect consistency, which can be trowelled or spread onto an existing surface.
A busy Leeds Freightliner container terminal located to the South East of Leeds needed replacement of a number of sections of the external paving. The site is subject to constant traffic and extreme loading, with loading vehicles weighting up to 100 tonnes when carrying a container and daily use by HGV’s.