As the built environment becomes increasingly data driven, the ability to access, understand and apply high quality geospatial information is no longer a specialist skill - it’s essential.
The Mercedes Benz Brentford project includes three new levels of car parking and vehicle storage, a second floor viewing gallery and a 54-meter modern display and storage tower. The main façade used horizontally laid aluminium cassette panels fixed back to SFS using the RJ Facades EVT substructure.
Llangrannog is a small seaside village in the county of Ceredigion and has a resident population of approx. 150, which increases to a population equivalent of 550 during the summer when tourists and day visitors arrive. Sewage treatment facilities were upgraded in 2003, but the existing sea outfall was kept at the time.
Scalable R-290 (propane) chillers and heat pumps from 17 kW to 2 MW, combining ultra-low GWP refrigerant, modular design and integrated safety for commercial and industrial HVAC applications - From Daikin Applied (UK).
Novoferm’s Novorol 77mm roller garage door has been tested to STS222 and achieved BR1 classification, demonstrating resistance to realistic intrusion attempts.
Gripsure supplied Bear Wood in Bristol with over 17,000 ln/m of Gripsure Classic for their immersive boardwalk. This elevates visitors above the forest floor, putting them right in the heart of the forest and gives panoramic views of the woodland.
Designed by Frank Shaw Associates the project involved the construction of a new appliance bay while the facility remained fully active. Accommodating 2 fire engines, 7 ambulances and the North West Blood Bikes team.