|
|
Wall Protection for University Hospital
|
|
Gradus supplied and installed approximately 40,000 linear metres of wall protection within the Queen Elizabeth University Hospita, equating to roughly 25 miles of productl.
|
|
|
|
|
|
|
‘Dragon’s fire’ under control at Mall
|
|
Dragon Mart 2 is using control solutions and more than 1100 actuators from SE Controls as part of the fire safety and smoke ventilation system at the 1.2 kilometre long retail centre.
|
|
|
|
|
|
|
Secure mail at Abbeville Apartments
|
|
The Safety letterbox Company supplied bespoke products for the Abbeville Apartments project, featuring multiple banks of wall recessed mail and parcel delivery boxes.
|
|
|
|