BA Systems were appointed by Wates construction to carry out a full balustrade package which included the design, supply and installation for Abbeygate Sixth Form College.
BA Systems worked with the technical team and internally on the design details to finally propose their B20 and B10 Balustrade Systems for the project which detailed the following:
B20 Stainless Steel and Glass Infill Balustrades to all 4 stair cores
B10 Stainless Steel Wall Handrails to all 4 stair cores
B20 Balustrade with no infills to stair 1 and 2 undercroft
B20 Stainless Steel and Glass Infill Balustrades to Atrium Voids on two levels
B20 Stainless Steel and Glass Infill Balustrades to Light Well on levels 1-3
View B10 Wall-Mounted Handrails Product Entry