Built on the historic Iffley Road, this state of the art multi sports facility is part of the Acer Nethercott Sports Centre built by Beard Construction which was part of the Universities new redesign.
This electronically pioneering sports hall uses the a Topperfo plywood system for the perimeter wall coverings. Typically, in a sports hall setting; the wall coverings need to be multifunction quite like the electronic flooring. The Topperfo systems chosen were specified to handle the large reverberant sounds created in such a vast space whilst withstanding the high impact nature of a sports facility home to cricket, football and hockey.
The walling was split in two sections; from 1.8m up hosts our Topperfo 16/16/8 (aw 0.75, Absorption Class C, NRC 0.90) whilst the lower section has had the Topperfo plain installed. Both with a European Oak Veneer both installed to withstand impact according to DIN 18032.