Balustrade installation at New Olympia leisure complex

Balustrade installation at New Olympia leisure complex

C.R. Laurence’s TAPER-LOC™ System has facilitated a speedy and simple installation of a new glass balustrade system at Dundee’s eagerly awaited new Olympia swimming and leisure complex.

The brand new complex features a 50 metre competition pool, wave pool, rapid river, dive pool, flumes and fitness suite. The Main Pool incorporates a movable floor and end walls to enable it to be reconfigured into a 25 metre Training Pool for clubs and public lane swimming.

The TAPER-LOC™ System was used to create a beautiful frameless balustrade in several areas of the pool and leisure complex. The clean lines of balustrade solution offered a simple but effective method to enclose the different types of seating and staircase arrangements.

TAPER-LOC™ is the simple way to install glass railings and balustrades it is 50% faster to install than traditional alternatives and as it is a totally dry glaze system there is no need for wet cement. The product is completely unique because it uses a horizontal TAPER-LOC design, which allows the system to be adjusted, dismantled and re-set easily and efficiently.

The TAPER-LOC™ System conforms to BS6180:2011 and is ideal for replacing scratched and broken panels in existing applications.

Add to Project Board

Create a new project board: