Location: Watford, UK
Sector: Medical - Hospital
Protection Required: Proguard Protectall Fleece & Proguard Bufferboard
Beck Group were privileged to have been chosen by Coniston as their protection partner for the Spire Hospital refurbishment project in Watford. After carrying out a site visit, they proposed a two-layer protection system, which would not only ensure the ultimate protection on-site but that it was also easy to install on-site.
Mark Marshall, Site Manager at Coniston, had the following to say:
“We have used varied brands of protection in the past, but the Spire Hospital Project required something unique and Beck provided that solution. Upon our request, Beck conducted a site survey and put forward a proposal involving a two-layer protection system. The system consisted of applying two products, Proguard’s self-adhesive Protectall fleece and the Bufferboard. Both products were quick and easy to install, and ultimately ensured peace of mind that the area we were working in was protected from potential damage. We have used these products on many of our projects since Spire and will continue to do so.”
If you are currently working on a healthcare refurbishment or build project that needs a bespoke temporary protection solution, talk to our team of specialists.
Give Beck a call on 01432 263 598 or email sales@beckuk.com. Alternatively, visit the site to learn more about them and what they do: https://www.proguardproducts.co.uk/
In addition to supplying a wide range of temporary protection solutions, they also provide a Collect Back recycling scheme for Correx board to help you keep your projects as sustainable as possible – get in touch to learn more or visit https://www.proguardproducts.co.uk/correx-collect-back-scheme.html to learn more.