Type of works: To provide secure, lockable storage for over 200 cycles.
Two compounds were supplied to the school: 1 No. 20 x 11m and 1 No. 10 x 2.5m.
Apex Shelter's installation team installed the full concrete plinth for the larger shelter to go onto a grassed area, and the footings into a tarmac area for the second shelter.