Comar completes new office at West Duddon Sands

Comar completes new office at West Duddon Sands

Comar Architectural Aluminium Systems; with their approved fabricator Formes Alutek Ltd recently completed a new build office building which forms part of ‘The West of Duddon Sands Offshore Windfarm’, a JV project between Scottish Power Renewables and Dong Energy. The project comprises of an onshore substation, 108 wind turbines with a total installed capacity of 389 megawatts and brand new bespoke Operations & Management office facilities based at West of Duddon Sands, Barrow-in-Furness.

A striking curved facade was installed and Comar 6EFT 4sided SG with concealed vents was selected as it provides a structurally glazed curtain walling solution with EPDM or Silicon seals which creates facets at 7.5° increments convex or concave. Comar EFT 4 sided offers architects the opportunity to maximise large glazed areas as it has the slimmest glazing seals available on the market.

The project was completed using Comar 5P.i top hung windows. The Comar 5P.i window system uses trademarked Polyamide Insulated (P.i) that provides exceptional thermal performance in a market where energy efficient designs and meeting the demands of the latest building regulations are paramount. All configurations, such as casement, top swing reversible, pivot, tilt and turn and sliding can be manufactured.

Add to Project Board

Create a new project board: