CPS Manufacturing Co worked alongside the stage engineering contractor Willmott Dixon and Unusual Rigging to revive the flexible floor space.
CPS designed, manufactured and installed four seating rostra configurations, three orchestra pit infill configurations and a stage infill. These staging systems and configurations provide the theatre with maximum flexibility for its events.
Supplying a total of almost 200 stage decks, circa 1200 stage legs and more than 200 fascia panels as well as valance curtains, this was the single largest staging project worked on CPS’s 53-year history