Bailey Streetscene were approached to tender for the external furniture and cycle shelters on the Tameside phase 2 Building Schools for the Future schemes.
Carillion appointed sub contractors to some of the schemes, but also commissioning the work direct on others. Bailey StreetScene where not the specified supplier on these projects, but via product design & modification, layout & foundation detail assistance were able to offer suitable acceptable alternatives.
The architects, main and subcontractor were all engaged in the process from concept stage to realisation and costing conclusions.
The result was that the projects where supplied with bollards, tree grills, seating, canopies, cycle shelters, litter bins, poster cases, bespoke cast iron paving slabs and column protects on time and to budget.
Bailey Streetscene also installed and supervised the shelter & canopy installations within the site regulations and construction standards set out by Carillion. All method statements, risk & COSH assessments where provided in line with current regulations.
On completion of the works operation and maintenance manuals were produced in line with supply and installed products.