Force-Dry boilers speed things up at Hoxton Press

Force-Dry boilers speed things up at Hoxton Press

Force-Dry provided their temporary boilers for main contractors, Wates, at the Hoxton Press residential development in London.

Contractors had scheduled the appropriate time period for the liquid floor screeds to dry, however due to the British climate the required temperature for drying could not be reached independently. This meant that the screed was taking longer than scheduled to dry.

Upon returning to the screed manufacturer for help and advice the Force-Dry solution was recommended and adopted across 198 dwellings in the 2 towers. Typical drying cycles of 21 days were achieved.

Each dwelling was force-dried in line with Force-Dry’s best practice guide with each dwelling sealed to a high standard, dehumidifiers in place and regular moisture testing all managed by the Wates team supported by Force-Dry engineers when required.

Add to Project Board

Create a new project board:


View Force-Dry temporary site boilers Product Entry View PDF
ForceDry

ForceDry

Established in 2012, following many years experience in underfloor heating, Force-Dry have developed a product that solves issues associated with drying and curing times for flowing screeds.

They operate a hire fleet of temporary site...
View company profile
T0845 6809269
Einfo@force-dry.co.uk
WVisit ForceDry's website
 Force Dry, Otterburn, Balscote, Banbury, Oxfordshire, OX15 6JL

Make an enquiry to ForceDry

You may also be interested in this related Case Study: ForceDry boilers at Barts Square Read Now