Project: Wessex Hotel – Dorset
Project Type: Ramp Heating
Location: Bournemouth – Dorset
Construction: Concrete re-enforcement bars – Heated driveway cables – Tampered concrete finish
System: Heated driveway cables
Size: 30 metre long ramp down to underground secure parking garage
Power: 8 x 4455w heated driveway cables
Heated ramp system for hotel and residential building project in Bournemouth.
The developer was looking for 4 tracks on this ramp to have 2 ice and snow free lanes for the traffic to and from this large parking area.
Technical info:
HDS supplied and installed 8 x 4455W heated driveway cables to heat 4 x tracks on this 30m long ramp down to an underground parking area.
The cables were fitted to the concrete re-enforcement bars before being covered with concrete.
The system is controlled by a HDS fully automatic ice and snow melting control, using 2 ground moisture sensors and one air temperature sensor.