Ikea Wembley

Contractor: RG Plant Ltd

Project Brief

Supply and installation of a bespoke walkway system, providing dry building access for employees from covered walkway to main staff entrance and additional secure cycle shelters and smoking / waiting shelter.

Composition

Galvanised and powder coated finish for maximum protection against corrosion
Height 2.6 metres, Width 1.5 metres
Roof clad with 5mm Clear PET
Total Length 125 metres (4060mm centres) including continuation of shelter to complete 90 degrees turn (mitred joint section)
Surface mounted 150mm below finished floor level, complete with adjustable feet to compensate for differences in floor level along the 125 metre run.
Full construction drawings supplied to enable complimentary lighting to be installed to shelter to provide continual usage / security.

Additional Bromley secure cycle shelter with integral racks for 20 cycles and Bromley smoking shelter / waiting shelter including perch seat.

Add to Project Board

Create a new project board:


Categories

Covered ways
Subscribe to the Barbour Product Search newsletter