Linton House, Cheltenham

Linton House, Cheltenham

Contractor: E W Beard
Type of works: design, manufacture and installation of shielding works for PET scanner unit.

Working for the main contractor, E W Beard, Envirotect was contracted to undertake all the shielding works required for this prestigious new scanner unit.

The structural shielding for the PET scanner entailed the installation of 8 and 10mm lead to all walls and soffits to the scanner room, corridor, storage room and three injection rooms. The shielding to the ceiling was designed as a suspended system so that the multitude of services above could be installed without penetrating the lead but would allow access for maintenace whenever required.

The contract also encompassed the supply of the 20mm lead equivalent observation window, and all the shielded doors within the department.

Envirotect also undertook the shielding for an x-ray room on the first floor, which included wall shielding, doorset and operator's x-ray screen.

Add to Project Board

Create a new project board:


T+44 (0)1525 374374
F+44(0)1525 219786
Einfo@envirotectltd.co.uk
WVisit Envirotect's website
 Unit L5, Cherrycourt Way, Leighton Buzzard, Bedfordshire, LU7 4UH

Make an enquiry to Envirotect

You may also be interested in this related Case Study: New cottage pane steel windows and doors for Arts and Crafts London home Read Now
Subscribe to the Barbour Product Search newsletter