WestWood Liquid Technologies has provided its Wecryl Waterproofing system for a balcony refurbishment project in East Sussex. WestWood approved installers, Michael Johnson Roofing, cleaned and prepared the existing substrate. Firstly, Wecryl 276 Primer Layer was applied following the Waterproofing Layer Wecryl 230.
After the Waterproof Layer cured, a two component Protective Layer using Wecryl 233 was installed. The system was completed by using a tile effect Finish with Westwood's Wecryl 288 Sealer Coat in RAL7043 including black/white deco chips that also provide some slip resistance.