This Heathrow project was comprised of the construction of a new 360 room hotel at Terminal 2 Heathrow Airport.
With close proximity to main T2 car park flyover and a cantilevered surface, the hotel build at Heathrow Airport was fraught with project site constraints. Mastclimbing provided the flexibility and adaptability that traditional scaffolding couldn’t.
BFT designed a 13-position set up of both BFT120s and BFT90s, in single and twin configurations.