Set in the heart of the Essex countryside, the new build project at Ramsden Hall Academy has delivered two new educational buildings, transforming the existing residential provision. The completed project has provided the pupils with independent living, along with a modern state of the art educational building.
The Specification
To meet the specific requirements for the project, main contractor, Morgan Sindall Construction Plc, worked closely with the Essex County Council Framework, officially known as the Essex Construction Framework 2 for main contractors.
The brief from the client was to install a flat roofing system that could deliver on the stringent requirements for acoustic performance to provide a calm and undisturbed teaching and living environment for the pupils. By working closely with architects, Pick Everard, and Morgan Sindall Construction Plc, the Bauder project team proposed Bauder Thermofol PVC single ply system incorporating BauderROCK mineral wool insulation.
This specific system was specified to ensure that the complete roofing system met the required acoustic performance, with the aim to minimise the amount of external noise that could be transmitted into the buildings to achieve project specification.
System Installed
The Bauder Thermofol Single Ply PVC system was installed to provide a solution that is durable and resistant to tears, punctures, and the European climate conditions, whilst aesthetically pleasing. This system is lightweight and quick to install making it a cost-effective method. Furthermore, the system build-up incorporated BauderROCK mineral wool insulation to provide a single source solution that met the projects acoustic performance requirements, ensuring that also other key aspects such as technical system performance, site installation requirements and commercial aspects were all met. The single ply membranes have a service live in excess of 35 years, as stated in British Board Agrément (BBA) certificate 06/4354 and the flat roofs for both buildings are covered by Bauder's comprehensive full system guarantee.
Testimonial
Simon Crofton-Sleigh - Senior Design Manager - Morgan Sindall Construction:
“The Bauder team provided us with excellent in-depth knowledge of the Bauder material during both the pre-construction and construction stages of the Ramsden project. The support ranged from giving knowledge of the material when coming across intricate detailing with the existing building, which allowed the architect and supply chain to achieve the correct detail. I would highly recommend Bauder to new customers to provide exceptional service.”