Architects: GT+3 Architects
Main Contractor: Wilmott Dixon
Joinery Contractor: Express Dry Lining
Products: Topperfo M 16/16/8
Finish: RAL 7035
Completed: Spring 2019
PROJECT INFORMATION
This wonderful sports hall is part of the New Addington Sports Centre in Croydon which was constructed as part of the Southern Construction Framework.
Designed by GT+3 Architects, delivered by Wilmott Dixon and installed by Express Dry Lining. Installing the Topakustik system; Topperfo 16/16/8 (aw 0.95, Absorption Class A, NRC 0.95) will have been utilised not just for the aesthetics but primarily for the acoustic capabilities. Topperfo M 16/16/8 will lower the reverberation times, lower the sound pressure levels and increase speech intelligibility within the hall.