New High Bay workshop in Hawarden

New High Bay workshop in Hawarden

Reidsteel are erecting a 60m long by 25m wide workshop building for a client located in the north west of England.

They are responsible for the design, fabrication and construction of the structural steelwork, together with the supply and installation of the composite rigid core insulated roof and wall cladding, plus all doors and windows.

The High Bay workshop has been designed to accommodate two electric overhead travelling cranes. Each with a SWL capacity of 25 tonnes, they’ll enhance the client’s existing fabrication facilities enabling them to offer an increased level of service to their customers.

A set of electrically operated sliding doors are located at one end of the building to provide a clear opening - 12m wide by 9m higher. A major feature of the building is the dual colour wall scheme which is punctuated with 71 glazed windows.

Add to Project Board

Create a new project board:


Subscribe to the Barbour Product Search newsletter