A 2009/10 project. The expansion includes not only a new triple house block but also offers a new offender management unit, reception, visitor suite and workshops. The project consisted of 4 separate buildings each with 61 fire/smoke dampers and a stand-alone addressable damper control panel.
Dampers within each building were wired onto data loops and connected via loop powered devices to provide for full control and open/closed status indication. Interfaces with the fire alarm panel would close all the dampers in the individual building.