Client: Royal United Hospital
Type of works: installed Advanced PVC claddings
Wall finishes to Operating theatres and associated theatre rooms were required that could be quickly and easily installed onto an existing decorative wall that was required to provide an antimicrobial hygienic barrier.
With the Operating theatre closed, Advanced had to install 250m2 of Advanced PVC claddings. Each sheet was fully-bonded to plastered walls and held within a welded trim system. Corners were thermoformed on site to ensure a smooth joint-free radius that provides easy cleaning and prevents a build-up of dirt.