Philip Peregreen Consultancy approached Moving Designs to assist in maximising the floor space in the main hall of a brand new £6m community sports hub in Wootton Bassett.
The aim was to sub-divide the main hall into two fully functional spaces to accommodate a range of sporting activities. Good onsite acoustic performance was imperative and the panels detailed to resist impact damage. Due to time constraints they required a system that was not only quick and easy to use but was robust enough for their demanding environment.
The structural support in the hub above the opening wasn’t sufficient to carry the weight of a top hung partition. The customer opted for floor supported continuously hinged panel systems with an ultra-low profile floor track system that offers excellent sound reduction.
View Prestige Acoustic Movable Wall Product Entry