Subfloor flooring for preschool in Skövde, Sweden

Subfloor flooring for preschool in Skövde, Sweden

UK Wide, family built business, Floor Levelling Systems Ltd have provided their Subfloor flooring for a preschool in Skövde, Sweden.

The Subfloor system was ideal for this preschool as the raised floor allowed installations to be placed under the floor and partition walls to be built on top of the chipboard.

45 mm insulation was positioned on the insulation bearers together with 22 mm chipboard on top.

Floor Levelling Systems Ltd’s flooring systems can also be used for housing, offices, sports facilities, public spaces and as terrace/outdoor decking.

Products
Wooden Joist 45 x 45 mm
SubFloor Screw 100 mm
SubFloor Screw Foot
Insulation Bearer 45 mm

Construction
Joist separation: c/c 600 mm
Building height: 50 – 111 mm

Add to Project Board

Create a new project board: