Barbour Product Search is part of the Informa Intelligence Division of Informa PLC

This site is operated by a business or businesses owned by Informa PLC and all copyright resides with them. Informa PLC's registered office is 5 Howick Place, London SW1P 1WG. Registered in England and Wales. Number 8860726.

SystemFirst for Forest Holidays

SystemFirst for Forest Holidays

Roger Bullivant provided foundation and ground floor systems for holiday lodges for client Forest Holidays Ltd.

The systems were provided for a series of timber framed one and two storey lodges on various sites nationwide.

The system used had to be adaptable to accommodate varying site conditions.

The foundation solution had to be installed with total environmental consideration as all the sites were in areas of outstanding natural beauty. They were insulated and suspended above the forest floor.

The award winning SystemFirst Foundation Solution was specified to suit the requirements of the lodges.

The ground floor, foundation beam and support all act holistically to provide a lightweight and robust foundation. The foundation reduces use of natural resources and lowers the carbon footprint of the building.

Supports were installed using RB Mini Rigs due to access and weight restrictions.

The BBA approved system comprises of an assembly of galvanised steel support beams, floor channels and closed cell expanded polystyrene insulation connected with in-situ reinforced concrete.

Add to Project Board

Create a new project board:


Roger Bullivant

View company profile
T(01332) 977 300
E[email protected]
WVisit Roger Bullivant's website
 Hearthcote Road, Swadlincote, Derbyshire, DE11 9DU

Make an enquiry to Roger Bullivant

You may also be interested in this related Case Study: Schöck Combar provides foundations for cancer treatment centre Read Now