Main contractor: Bovis Lend Lease Ltd
Sub-contractor: Richardson Roofing Co Ltd
Size of contract - linear: 290 metres
Application: Building renovation - gutter protection
Location: Millbank, London
As part of the renovation of this famous old institution, the gutters needed protection from foot traffic. The old system was unsightly and had left rust stains throughout the extensive network of guttering.
Fixfasts DukMat could be rolled into place and easily cut to fit the varying width and protrusions, saving time and minimising joins. The result is a clean, neat and hardwearing solution fit for this grand landmark building.