Type of works: supply of 60 DP6-2800 panels to heat a University swimming pool.
60 DP6-2800 panels is the largest DP6 installation in Europe. These panels are on The University of Brighton Meade Sports Centre. They are expected to make a major contribution to heating a 400,000 litre pool. The equipment is monitored and is providing research information for the post graduate students in the University's Department of the Built Environment.