Variopool has completed the project in the new Workington Leisure Centre in Workington, Cumbria.
The company installed a 15 x 10m movable floor with a flap and integrated stairs into the Teaching pool. The stairs ensure everyone can get into the pool on their own in a comfortable and safe manner.