ULMA discuss a remarkable project they were involved in, that was completed in record time: the Hospital de Emergencias Enfermera Isabel Zendal in Madrid.
During the pandemic, major hospitals in Madrid were overwhelmed. Recognizing the urgent need, the Community of Madrid undertook the construction of a new hospital, completing it in just six months.
Multiple top-tier construction companies worked simultaneously on this urgent project, and ULMA contributed by providing their drainage solutions.
The project management team contacted ULMA's sales representatives with their requirements, and two different channel models: SELF200 and S200 were supplied, both equipped with iron grating.
• SELF200 Channels: Installed in various pedestrian areas with low hydraulic requirements.
• S200 Channels: From the Civil range, installed in cross-traffic areas. These channels are designed for heavy loads and feature 8 safety attachment points per linear meter, ensuring better stability and even distribution of force along the grating and channel.
Fast Supply
ULMA have an extensive international sales and distribution network to ensure their drainage solutions are available whenever and wherever needed.
For the Hospital de Emergencias Enfermera Isabel Zendal, ULMA met the urgent demand by supplying over 1000 linear meters of channels with grating in just over a month, even whilst sales representative and the rest of the team were housebound.
ULMA understand the importance of time, which is why being available to customers is a crucial part of their work. When ULMA talk about accessibility, they mean being there when you need them.
All projects are important to the team at ULMA, but this one was especially urgent, and they were proud to play a part in its swift completion. If you're looking for a drainage solution, ULMA are here to help.