A1 Alleredene Bridge, Gateshead

A1 Alleredene Bridge, Gateshead

Sector: Highways
Client: Highways Agency
Contractor: Balfour Beatty Civil Engineering

Following assessment of the bridge it was determined that localised corrosion of the embedded steel had taken place within the bridge deck to the south bound carriageway. Balfour Beatty were contracted to remove the existing wearing course and waterproofing system and breakout areas to the deck identified to have suffered corrosion and make good. The A1 is a heavily trafficked section of trunk road therefore construction programming and disruption to road users had to be kept to a minimum.

Balfour Beatty had two options open to them, a rapid cure bagged mortar system that was both labour intensive and costly or bespoke rapid drying concrete designed to allow early application of vapour sensitive waterproofing. Diamondcrete RD was trialled prior to commencement of works onsite where a mock up section was cast. Testing for residual moisture content and strength followed indicating that the waterproofing systems could be installed after 3 days of curing.

Diamondcrete RD facilitated the early completion of the works in a safe and cost effective manner with reduced manpower and plant ensuring less disruption to road users.

Add to Project Board

Create a new project board:


View Ready mix Concrete Product Entry
Aggregate Industries - Concrete

Aggregate Industries - Concrete

Aggregate Industries - Concrete supplies ready-mixed concrete in the UK. The company has customers from the majority of the major construction industry contractors, house builders, and specialist subcontractors: They also work with clients and...
View company profile

Make an enquiry to Aggregate Industries - Concrete

You may also be interested in this related Case Study: Mapei aids a safe floor installation at Sunningdale Read Now