Antique Fumed Chevron at Battersea Power Station

Antique Fumed Chevron at Battersea Power Station

Antique Fumed Chevron Parquet Engineered Wood Flooring 60-degree chevron oiled finish.

Originally specified for phase two of the Battersea Power Station project The Solid Wood Flooring Company are now fitting this in Parker Tower Convent Garden London.

Ramos Catarino are the fit-out contractor and because this is a small chevron with a 60-degree angle they are using SWF’s professional wood floor fitters.

These are apartments and site conditions are always difficult because of the number of different trades working at the same time.

The finish of all SWF’s engineered wood flooring is resilient enough to withstand this and all that is needed is a good clean using the latest soap oils. The images below show the different areas and stage of the installation.

The edges of each piece are slightly antiqued, and the surface is brushed to add texture.

Setting out is the most crucial part of any installation. These site conditions are not perfect and there is still painting to be done and electrical work.

In normal circumstances this would not be advisable but when large projects require a fit-out schedule to be met SWF are left with little choice. Please do not do it this way if it is your home.

To view more of their project case studies or to buy solid wood floor online head over to their website.

Add to Project Board

Create a new project board:


The Solid Wood Flooring Company

View company profile
T(01666) 504015
F(05603) 146907
Einfo@thesolidwoodflooringcompany.com
WVisit The Solid Wood Flooring Company's website
 Unit 1 Helena Court, Hampton Street, Tetbury, Gloucestershire, GL8 8JN

Make an enquiry to The Solid Wood Flooring Company

You may also be interested in this related Case Study: Rathbone, Oxford Street Read Now