Choosing a quick curing solution

The Crumlin Bridge was leaking, with corrosion evident in the structure. It required a new waterproofing solution as part of the refurbishment works to the bridge. In addition, due to the schedule of works, the project team required a solution that would enable the tack coat to be trafficked prior to laying the asphalt.

The bridge became another structure to benefit from the third-generation bond coat in conjunction with the market leading ELIMINATOR waterproofing system from Stirling Lloyd (now GCP Applied Technologies). The development of Bond Coat 3 represents a major leap forward in the provision of high-performance, heat activated bond coats.

Keeping Traffic Moving

Factors such as possession working, limited access, restricted working hours, and traffic management all needed to be considered. Since there wasn’t going to be a full road closure on this site, the refurbishment works had to be split into two phases over a short period of time.

This included deck preparation, installation of expansion joints, application of the waterproofing system and the installation of curbs, followed by the asphalt binder and surfacing courses.

A waterproofing solution to aid project completion

The specifier selected ELIMINATOR, which is based on unique ESSELAC technology, as well as Bond Coat3, a cold reactive resin system providing a durable, protective finish, resistant to site damage with unlimited open time prior to application of the surfacing.

Prior to application, shot blasting and fine milling was carried out, with the METASET concrete system being used to repair rough and damaged areas of the bridge deck in preparation to receive the waterproofing system. The deck was primed to seal the deck and promote excellent bond between the deck and the membrane.

The ELIMINATOR membrane was then cold spray-applied and checked using a wet film gauge to confirm the required coverage and thickness had been achieved. Once the waterproofing membrane had been applied and left approximately 30 minutes to cure, it was electrically integrity tested (holiday detection test) to confirm that a defect-free, fully waterproof barrier had been achieved.

Bond Coat 3 was then spray-applied. The durability and unlimited open time of Bond Coat 3, allowed flexibility in the schedule and the following trades to proceed in compliance with the programme of works without unnecessary delays, saving time, money and further disruption.

Due to the success of the project ton the first 1150 metres of carriageway, the second phase of the project went ahead as planned, completing the refurbishment of the Crumlin Bridge.

Add to Project Board

Create a new project board:


GCP Applied Technologies

GCP Applied Technologies

GCP Applied Technologies products are specified by architects and engineers and are used by contractors, ready mix, precast and block producers, cement manufacturers to enhance the durability, strength and appearance of structures found in many major...
View company profile

Make an enquiry to GCP Applied Technologies

You may also be interested in this related Case Study: GCP Technologies helps fast-track prestigious Dubai Development Read Now