During the redevelopment of the new Terminal 2 at Heathrow Airport, Vetter UK, the specialist contracting division of Laing O’Rourke, faced the challenge of specifying a fast-drying screed solution to accommodate the project’s tight schedule and minimize disruptions. They required a screed that could be installed at a depth of 135mm while supporting the rapid progress of subsequent construction activities.
To meet these demanding requirements, RonaScreed FastDry Prompt was selected due to its rapid-drying properties, which significantly reduced waiting times before further work could commence. Additionally, its versatility allowed it to be mixed at ground level and pumped up three storeys to the application site, streamlining the process and contributing to significant savings in both time and costs.