Sector: Commercial
Client: Dandara
Contractor: Stephenson Construction
Aggregate Industries discussed the customer's needs, allowing them to understand the requirements and provide a product that was able to dry quickly and required low construction noise
Glasgow Harbour is a 14 storey apartment development alongside the river Clyde west of Glasgow City Centre. This project was adjacent to existing occupied apartment dwellings. As a result, the contractor was mindful of airborne noise from the construction / concreting process.
Following initial discussions with Stephenson Construction; the concrete frame contractor, Aggregate Industries proposed Cemflow H, a free flowing concrete that eliminated the need for vibration equipment and allowed immediate finishing of flatwork to an SR2 tolerance thereby removing the night time finishing process.
In total some 6,000m3 of flatwork and 1,000m3 of vertical concrete utilised the Cemflow technology. As a result the concreting process had little or no affect on the local residents.
View Ready mix Concrete Product Entry