Sun Life Stadium underwent a renovation for which Novum engineered and supplied structural steel support, perforated aluminum panels, glass and glazing system for the curved north and south facades.
The challenges Novum faced were hurricane force wind loads, a highly custom architectural form and a completion timeline of 12 months. A wind tunnel study contracted by Novum revealed less than anticipated load results, which reduced engineering time and material costs.
Innovative thinking, rapid engineering, in house manufacture of steel and a strong global sourcing network enabled Novum to deliver on schedule.
View Structural Frames Product Entry