Utility CDM Risk Assessment
Apogee Property & Utility Consultants
The requirements of the new CDM Regulations published in 2015 moved the responsibility for the pre-contract H&S pack from the Main Contractor to the Client or his Principle Designer.
Apogee draws on decades of experience of assessing the health & Safety risk of conflict with utility plant, offering this comprehensive report. Apogee's experts compare the utility plant search results with the client's scheme drawings and deliver a full analysis of risk and a set of recommended actions to minimise on Health & Safety risk. This enables the client to determine what courses of action are required to ensure HSG47, PAS 128 and CDM regulation compliance.
Apogee's report delivers a Risk Classification, ALARP assessment, severity and likelihood designations. The result is a report that takes the client through the process in accordance with HSG47 and PAS 128, enabling competitive tendering for further site investigations either before or after the pre-contract Health & Safety pack.
Apogee give a fixed fee approach and a report delivered in an unlocked PDF with a useful summary page and table of risks.
Suitable for:
Solicitors, Clients, Designers and Project Manager, Developers, Local Authorities Consultants, Architects, Design & Build Contractors, Contractors, Highway scheme promoters, Surveyors and Health & Safety consultants.
Fees start from £400 + VAT
• £2 million PI Insurance
• Covers requirements of CDM file and pack
• Most comprehensive and cost effective search the market guaranteed
• Delivered in user-friendly PDF report
• All site sizes and shapes, standard size up to 25 Ha
• Speeds of service available 25 day
• RAG risk severity rating for easy interpretation
• Action recommendations, HSG 47 and PAS 128 commentary