MEAKERB BRIDGE 160/200 improves roadway drainage by combining kerb and drainage functions, allowing extended run lengths with fewer outlets, and integrating smoothly into existing infrastructure for refurbishments. Its hollow-edge design reduces weight and construction costs, while compatibility with different heights and porous asphalt provides versatility, making it an efficient choice for streamlined road planning.
MEAKERB BRIDGE 160/200 offers significant advantages over traditional point drainage systems for architects and planners:
• Available in two distinct heights and in OPA (porous asphalt) versions, it features a range of extensive accessories to suit diverse project needs.
• Allows longer continuous run lengths, which significantly reduces the number of required vertical outlets, simplifying installation and maintenance.
• By combining kerb and roadway drainage, MEAKERB BRIDGE enables efficient management of surface water along both edges and road surfaces.
• Ideal for renovation projects, as it can seamlessly integrate with existing drainage openings, minimizing the need for major structural adjustments.
• Eliminates the need for a longitudinal slope in the road surface or edge area, which can simplify road design and reduce material costs.
• Its hollow edge channels contribute to a reduced overall weight, lowering construction costs by saving on both material and canopy weight requirements.